GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
07:39 Oct 16, 2004 |
English to Russian translations [PRO] Business/Commerce (general) | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Sergey Strakhov Local time: 05:32 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 | сбалансированный объем (заказа) |
| ||
2 | оптимальное количество |
|
best build quantity сбалансированный объем (заказа) Explanation: Я так понял из описаний (см. ниже), что это термин введен одной из фирм и не может еще считаться "устоявшимся" Orenda Turbines developed the Best Build process by creating a computer-based process that took advantage of the companys Equipment Condition Monitoring System, an existing database used since the mid-1980s. The Best Build process matches individual components (based on remaining service life) from the rotor assemblies currently undergoing repairs. Each match is based on real-life data of the components life cycle. Using an interactive process, the program selects a combination of parts and conducts a calculation for each combination of components to determine how many times the rotor assembly will have to be returned before all of the life cycled components need replacing. Once the program selects the best combination of components for each rotor, a build sheet describing each component is generated and the specified components are removed from the database inventory. The program also determines the value of the throwaway lives of parts which have not yet exhausted their life cycles. Orendas Best Build process has proven to be beneficial to the Canadian Forces, which rates its field maintenance facilities on their ability to build and repair engines that can remain in service for the maximum number of hours. Since implementing its process, Orenda Turbines now builds all rotor assemblies for the Canadian Forces maintenance facilities with the maximum life cycle parts available. As a result, the company can ensure extended service hours as well as reduce the number of acceptable life cycle parts discarded. http://www.bmpcoe.org/bestpractices/internal/ortur/ortur_4.h... The most advantageous replenishment quantity of each product will allow a distributor to maximize the return on their investment in inventory. In this section of the course, we will look at various ways of determining the replenishment quantity and when each method is appropriate. Topics will include: The economic order quantity The "best build" quantity for assembly and manufacturing Inventory and bills of material Dealing with spare parts inventories Are there items that do not require a constant perpetual balance? How do you control their stock? Buying in advance of a price increase Determining the proper purchase when faced with several discount options A check list to prevent new stock items from becoming dead stock Order quantities when importing (containers and long lead times) http://www.effectiveinventory.com/Seminar102804.html |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
best build quantity оптимальное количество Explanation: .. -------------------------------------------------- Note added at 38 mins (2004-10-16 08:18:10 GMT) -------------------------------------------------- еще хотел предложить \"наилучшая величина\", но слово \"оптимальный\" вроде бы подразумевает и это |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.