09:26 May 21, 2015 |
Italian to English translations [Non-PRO] Tech/Engineering - Law (general) | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Elisa Pappolla Italy Local time: 03:20 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
5 | incoming waste approval |
|
incoming waste approval Explanation: "perfezionamento" in this case means that the facility has to check that the incoming waste is really that waste declared by the waste generator (e.g. if he declares that it's non-haz. and the facility receives a waste containing oil-contaminated soils (hazardous), it is rejected). Once the facility has checked that everything's ok, it can authorize the waste and it releases the approval (ok, this waste can be placed/treated/disposed in my facility). |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.