09:34 Feb 9, 2012 |
|
Spanish to English translations [PRO] Tech/Engineering - Energy / Power Generation / Turbo compressor supply | |||||||
---|---|---|---|---|---|---|---|
|
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | put into operation |
| ||
3 +1 | loading |
| ||
3 | start-up |
|
Discussion entries: 1 | |
---|---|
put into operation Explanation: . |
| |
Login to enter a peer comment (or grade) | ||
The asker has declined this answer |
start-up Explanation: - |
| |
Login to enter a peer comment (or grade) | ||
The asker has declined this answer |
loading Explanation: BASE LOADING Install the turbo compressor for base loading operations. * Base loading: minimum air consumption GROUP CONTROL Efficient operation is supported by expanding the control range of partial-load operation on the IHI control panel. |
| |
Login to enter a peer comment (or grade) | ||
The asker has declined this answer |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.