excentricidade na elevação

English translation: eccentricity at lifting (and transporting the crane load)

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Portuguese term or phrase:excentricidade na elevação
English translation:eccentricity at lifting (and transporting the crane load)
Entered by: joaopina

04:12 Aug 26, 2011
Portuguese to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering
Portuguese term or phrase: excentricidade na elevação
As cargas transversais serão devidas à aceleração ou frenagem do trole e à excentricidade na elevação e balanço da carga movimentada.

é em estruturas metálicas
Thx
joaopina
Portugal
Local time: 08:55
eccentricity at lifting (and transporting the crane load)
Explanation:
If the load is lifted and transported when the trolley is eccentric (not in the middle of the crane girder), horizontal forces are generated that must be resisted by the crane runway girders.
Selected response from:

asptech
Local time: 09:55
Grading comment
Thx!
4 KudoZ points were awarded for this answer



Summary of answers provided
4 +1eccentricity at lifting (and transporting the crane load)
asptech
4peculiarity in rise
Flavia Martins dos Santos
3Difference in height
suesimons
Summary of reference entries provided
Marginal discussion - balanço da carga
Rintje

  

Answers


3 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
Difference in height


Explanation:
A suggestion.

suesimons
Local time: 08:55
Specializes in field
Native speaker of: English
PRO pts in category: 44
Login to enter a peer comment (or grade)

8 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
peculiarity in rise


Explanation:
suggestion

Flavia Martins dos Santos
Brazil
Local time: 04:55
Native speaker of: Portuguese
PRO pts in category: 16
Login to enter a peer comment (or grade)

13 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5 peer agreement (net): +1
eccentricity at lifting (and transporting the crane load)


Explanation:
If the load is lifted and transported when the trolley is eccentric (not in the middle of the crane girder), horizontal forces are generated that must be resisted by the crane runway girders.

asptech
Local time: 09:55
Specializes in field
Native speaker of: Native in SwedishSwedish
PRO pts in category: 79
Grading comment
Thx!

Peer comments on this answer (and responses from the answerer)
agree  Rintje: ....at lifting and swinging (of the load); this balanço means the swinging of the load, not the overhang of the crane, which is a known value; the swinging causes an additional eccentrictiy
8 hrs
  -> Not from the swinging load, but from the crane bridge itself when it travels with an eccentric load.
Login to enter a peer comment (or grade)




Reference comments


2 days 10 hrs
Reference: Marginal discussion - balanço da carga

Reference information:
load swinging or load sway - see link below


    Reference: http://www.cranestodaymagazine.com/story.asp?storyCode=20262...
Rintje
Works in field
Native speaker of: Native in DutchDutch, Native in PortuguesePortuguese
PRO pts in category: 12
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search