omloppssystem / omloppshanteringssystem

English translation: routing system/routing management system; pathing system/pathing management system

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
Swedish term or phrase:omloppssystem / omloppshanteringssystem
English translation:routing system/routing management system; pathing system/pathing management system
Entered by: Ingemar Kinnmark

14:49 Mar 19, 2010
Swedish to English translations [PRO]
Tech/Engineering - Transport / Transportation / Shipping / Railway sector systems administration
Swedish term or phrase: omloppssystem / omloppshanteringssystem
Don't know if the client needs UK or US terms, but since I don't like any of my own conclusions, all input is appreciated!
Susanne Lomander
Sweden
Local time: 03:57
routing system/routing management system
Explanation:
The key issue is to define the concept "omlopp" in this context. It is most fundamentally based on the concept "lokomlopp". I will define the "lokomlopp" concept by a suitable Swedish text. Then I will proceed to find the term in English that has this same definition, using a suitable English text. This will provide the translation.

Swedish reference, formated to fit the constraints of this medium:

Det arbete som förarna utför föregås av en lång och komplicerad planeringsprocess. Lite förenklat kan denna sägas bestå av fyra steg.

1. Tidtabell

2. Lokplanering

3. Turplanering

4. Bemanningsplanering.

Detta är en vanlig uppdelning av planeringsprocessen inom både järnvägs-
och flygindustrin. Processen går inte alltid från 1. till 4. Ofta sker ändringar
som innebär att vissa steg får göras om.

I det första steget bestäms vilka behov som finns utgående från kundernas
krav. Efter förhandlingar med Banverket, som bestämmer hur operatörerna
får utnyttja järnvägsnätet, bestäms sedan en tidtabell. Denna tidtabell anger
förutsättningarna för Green Cargos trafik.

I nästa steg bestäms hur lokparken ska utnyttjas för att täcka alla upp-
drag. Förutom tidtabellen tas här även hänsyn till bl.a. underhållsplaner för
loken. Det system som används för att skapa dessa s.k. lokomlopp kommer
från Carmen Systems och heter Carmen Fleet.

Link: http://213.153.114.231/upload/264/magnusandersson.pdf

English reference:

Given a schedule of trains, the locomotive planning (or scheduling) problem (LPP) is to determine the minimum cost assignment of locomotive types to trains that satisfies a number of business and operational constraints. Once this is done, the railroad has to determine the sequence of trains to which each locomotive is assigned by unit number so that it can be fueled and serviced as necessary. We refer to this problem as the locomotive routing problem (LRP).

Link: http://jorlin.scripts.mit.edu/docs/publications/118-locomoti...

Selected response from:

Ingemar Kinnmark
Local time: 21:57
Grading comment
Tack för utförlig information!
Själv hittade jag även "pathing", vet inte om det är någon skillnad mellan pathing/routing.
Tack för svar!
3 KudoZ points were awarded for this answer



Summary of answers provided
3routing system/routing management system
Ingemar Kinnmark


Discussion entries: 3





  

Answers


7 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
routing system/routing management system


Explanation:
The key issue is to define the concept "omlopp" in this context. It is most fundamentally based on the concept "lokomlopp". I will define the "lokomlopp" concept by a suitable Swedish text. Then I will proceed to find the term in English that has this same definition, using a suitable English text. This will provide the translation.

Swedish reference, formated to fit the constraints of this medium:

Det arbete som förarna utför föregås av en lång och komplicerad planeringsprocess. Lite förenklat kan denna sägas bestå av fyra steg.

1. Tidtabell

2. Lokplanering

3. Turplanering

4. Bemanningsplanering.

Detta är en vanlig uppdelning av planeringsprocessen inom både järnvägs-
och flygindustrin. Processen går inte alltid från 1. till 4. Ofta sker ändringar
som innebär att vissa steg får göras om.

I det första steget bestäms vilka behov som finns utgående från kundernas
krav. Efter förhandlingar med Banverket, som bestämmer hur operatörerna
får utnyttja järnvägsnätet, bestäms sedan en tidtabell. Denna tidtabell anger
förutsättningarna för Green Cargos trafik.

I nästa steg bestäms hur lokparken ska utnyttjas för att täcka alla upp-
drag. Förutom tidtabellen tas här även hänsyn till bl.a. underhållsplaner för
loken. Det system som används för att skapa dessa s.k. lokomlopp kommer
från Carmen Systems och heter Carmen Fleet.

Link: http://213.153.114.231/upload/264/magnusandersson.pdf

English reference:

Given a schedule of trains, the locomotive planning (or scheduling) problem (LPP) is to determine the minimum cost assignment of locomotive types to trains that satisfies a number of business and operational constraints. Once this is done, the railroad has to determine the sequence of trains to which each locomotive is assigned by unit number so that it can be fueled and serviced as necessary. We refer to this problem as the locomotive routing problem (LRP).

Link: http://jorlin.scripts.mit.edu/docs/publications/118-locomoti...



Ingemar Kinnmark
Local time: 21:57
Native speaker of: Native in SwedishSwedish
PRO pts in category: 10
Grading comment
Tack för utförlig information!
Själv hittade jag även "pathing", vet inte om det är någon skillnad mellan pathing/routing.
Tack för svar!
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search