Work Breakdown Structure
English to Romanian
Tech/Engineering
Nuclear Eng/Sci
"Every component from this structure as Work Breakdown Structure will be all time optimised and ALARA principle will be applied." Cum traduc aceasta fraza?
Proposed translations
(Romanian)
References
Referinta | Annamaria Amik |
Proposed translations
+2
13 mins
Selected
Repartizarea activitatii / sarcinilor
Succes
Peer comment(s):
agree |
Anca Nitu
: fara indoiala
9 hrs
|
Va multumesc frumos
|
|
agree |
ELLA IACOB
10 hrs
|
Va multumesc frumos
|
2 KudoZ points awarded for this answer.
16 mins
catalogul organizat / structurat pe activitati / al activitatilor de baza
Din Lexique Framatome:
work breakdown structure = catalogue organisé des tâches élémentaires
work breakdown structure = catalogue organisé des tâches élémentaires
2 hrs
structura ierarhica a activitatii
... necesara pentru indeplinirea obiectivelor proiectului
Cu bine
--------------------------------------------------
Note added at 2 hrs (2009-04-29 09:14:57 GMT)
--------------------------------------------------
Cred ca "ierarhic" este bine sa apara in traducere deoarece este o trasatura importanta a WBS, specificata in definitia acestuia
Reference:
http://www.tensteppb.com/5.3.01.1TSCreateWBSProcess.htm
http://www.ac.tuiasi.ro/ro/library/managementul_proiectelor_web/pdf/obiective.pdf
+1
20 mins
Structura Principala de Descompunere
Fiecare componenta a acestei structuri ,Structura Principala de Descompunere (a proiectului), va fi optimizata si principiul ALARA va fi aplicat.
--------------------------------------------------
Note added at 5 hrs (2009-04-29 12:40:36 GMT)
--------------------------------------------------
http://www.okservice.ro/word_filles/mai_2009/manager_proiect...
--------------------------------------------------
Note added at 5 hrs (2009-04-29 12:40:36 GMT)
--------------------------------------------------
http://www.okservice.ro/word_filles/mai_2009/manager_proiect...
Peer comment(s):
agree |
Valentina Meyer
5 hrs
|
multumesc
|
|
neutral |
Anca Nitu
: chestia e ca nu proiectul "se descompune" ci munca menita sa duca la finalizarea lui , cat despre structura de descompunere sa nu va suparati dar suna ca " ordinea entropiei "
9 hrs
|
poate ca " structura de descompunere a activitatilor unui proiect" nu suna atat de bine dar am auzit-o adesea . eu personal prefer sa folosesc direct termenul in engleza
|
1 day 2 hrs
deviz de lucrare
WBS este un contract, care se refera la totalitatea costurilor defalcate pe activitati, care la randul lor, trebuie adaptate principiului Radioprotectiei ALARA (As Low As Reasonable Achievable), un principiu care, prin aplicare, poate redefini activitatile, si deci poate creste costurile, scopul tinta fiind de aceasta data protectia individului, si nu neaparat costul final.
Example sentence:
"Prestatorul va întocmi, în urma constatării, devizul estimativ privind valoarea serviciilor..."
Peer comment(s):
neutral |
Annamaria Amik
: termenul nu poate fi aplicat in toate domeniile, si inseamna ceea ce in EN e bill of quantities. Nu reflecta structura ierarhica, repartizarea, defalcarea, care este un aspect important in WBS.
1 hr
|
18 mins
structura/diagrama de clasificare a activitatilor
Fraza intreaga ar suna cam asa:
"Fiecare componeta a structurii/diagramei de clasificare a activitatilor va fi optimizata continuu ;i se va aplica principiul ALARA."
Cred insa ca trebuie explicat putin:
work breakdown structure
The basic information in the Cost Guide includes the purpose, scope, and schedule of a cost estimate; a technical baseline description; a work breakdown structure (WBS); ground rules and assumptions; how to collect data; estimation methodologies; software cost estimating; sensitivity and risk analysis; validating a cost estimate; documenting and briefing results; updating estimates with actual costs; EVM; and the composition of a competent cost estimating team.6 The guide discusses pitfalls associated with cost estimating and EVM that can lead government agencies to accept unrealistic budget requests—as when risks are embedded in an otherwise logical approach to estimating costs.
http://www.galorath.com/wp/final-version-of-the-gao-cost-gui...
(se refera la managementul costurilor)
iar in ce priveste "principiul ALARA" uite ce am gasit:
The second feature, or element, is optimization, which is also known as the practice of ALARA (as low as reasonably achievable).
http://www.hps.org/publicinformation/ate/q435.html
Sper sa-ti fie de ajutor :)
--------------------------------------------------
Note added at 3 zile23 ore (2009-05-03 06:29:49 GMT)
--------------------------------------------------
sau "clasificarea/defalcarea pe grupe de activităţi"
"Fiecare componeta a structurii/diagramei de clasificare a activitatilor va fi optimizata continuu ;i se va aplica principiul ALARA."
Cred insa ca trebuie explicat putin:
work breakdown structure
The basic information in the Cost Guide includes the purpose, scope, and schedule of a cost estimate; a technical baseline description; a work breakdown structure (WBS); ground rules and assumptions; how to collect data; estimation methodologies; software cost estimating; sensitivity and risk analysis; validating a cost estimate; documenting and briefing results; updating estimates with actual costs; EVM; and the composition of a competent cost estimating team.6 The guide discusses pitfalls associated with cost estimating and EVM that can lead government agencies to accept unrealistic budget requests—as when risks are embedded in an otherwise logical approach to estimating costs.
http://www.galorath.com/wp/final-version-of-the-gao-cost-gui...
(se refera la managementul costurilor)
iar in ce priveste "principiul ALARA" uite ce am gasit:
The second feature, or element, is optimization, which is also known as the practice of ALARA (as low as reasonably achievable).
http://www.hps.org/publicinformation/ate/q435.html
Sper sa-ti fie de ajutor :)
--------------------------------------------------
Note added at 3 zile23 ore (2009-05-03 06:29:49 GMT)
--------------------------------------------------
sau "clasificarea/defalcarea pe grupe de activităţi"
Reference comments
5 hrs
Reference:
Referinta
Vezi explicatia din textul referinta (Structura de alocare a activitatilor)
O alta varianta: Structura defalcata a activitatilor.
O alta varianta: Structura defalcata a activitatilor.
Discussion
Mi se pare utila si pagina alocata WBS pe wikipedia. http://en.wikipedia.org/wiki/Work_breakdown_structure
Alte variante: Structura detaliata/ierarhica a activitatilor.
Tin sa mentionez ca e important aici Work --> Activitati, pentru ca exista si Cost Breakdown Structure, Resource Breakdown Structure.
De altfel, se pare ca WBS are cateva traduceri care circula in managementul proiectelor (a se cauta pe google), parerea mea este ca in cazul de fata ar trebui aleasa varianta cea mai frecventa in domeniul respectiv. Sau sa ne unim noi traducatorii si sa folosim consecvent una singura bucata de varianta :)
Poate alte variante suna mai bine dar nu sunt 100% conforme cu practica.