- Jan 9 '18 eng>jpn sand carrier fluid 破砕流体 pro closed no
4 May 25 '17 jpn>eng 発進・到達立坑 launch and reception shafts pro closed ok
- Apr 10 '15 jpn>eng 工事長 site manager pro closed no
4 Mar 11 '15 jpn>eng 配管上面 the top face/upper side/surface of the pipeworks/piping system pro closed no
4 Feb 4 '15 eng>jpn soft zones of reinforcement 強化された/する柔らかい部分 pro closed no
- Feb 2 '15 eng>jpn 3 no. new mabholes 新しいマンホール(#3) pro closed no
- Oct 9 '14 jpn>eng 埋設ベース underground support pro closed no
- Oct 7 '14 jpn>eng 完成検査ピット工事 Construction of the complete inspection pit pro closed ok
4 Oct 6 '14 jpn>eng 追加する事 This will be added to the existing Building Management System pro closed no
4 Oct 6 '14 jpn>eng 室温制御を切り替える alternating between room temperature controls pro closed ok
- Oct 6 '14 jpn>eng Answer hidden by answerer pro closed ok
4 Oct 6 '14 jpn>eng BMSの下に within the building management system pro closed ok
3 Sep 24 '14 jpn>eng 片切片盛 cut and fill pro closed no
4 Sep 22 '14 jpn>eng 適合みなし仕様 appropriate specifications pro closed ok
4 Sep 20 '14 jpn>eng 路盤 sub-base pro closed ok
4 Sep 10 '14 jpn>eng 津波・越流時の流速は flow velocity during tsunami overflow pro closed no
- Sep 3 '14 jpn>eng 落掘 depression (localized low-lying area) pro closed ok
- Aug 23 '14 jpn>eng Answer hidden by answerer pro closed ok
- Aug 9 '14 eng>jpn acoustically line 防音材料を貼る pro closed no
- Jul 20 '14 jpn>eng 杭打ち基礎上コンクリート梁形式 grade beam pro closed no
- Jul 16 '14 jpn>eng ダクターチャンネル wire chase / cable chase pro closed no
4 Jul 12 '14 jpn>eng 中耐 Medium duty pro closed ok
- Jul 12 '14 jpn>eng 認定道路 public road pro closed no
3 Jul 11 '14 jpn>eng 腐植酸種子 Humic acid seed treatment pro closed ok
- Jun 6 '14 jpn>eng 木端張り Roman brick veneer pro just_closed no
- Jun 6 '14 jpn>eng Answer hidden by answerer pro just_closed no
- Jul 1 '13 jpn>eng ○ 正 ✓ correct pro closed no
- Feb 14 '13 eng>jpn nitro thinner ニトロセルロースラッカーシンナー pro just_closed no
- Jan 29 '13 eng>jpn arise, arising ガラスエッジング pro just_closed no
4 Sep 10 '12 eng>jpn hard date 絶対予定日 pro closed ok
- Sep 8 '12 eng>jpn production pile 建設パイル pro just_closed no
- Sep 3 '12 eng>jpn two single-roadbed continuous closures 二回、一線路の路盤を連続閉鎖した pro just_closed no
- Sep 3 '12 eng>jpn I/D (incentive/disincentive) type contract インセンティブ契約 pro just_closed no
- Sep 3 '12 eng>jpn I-15 I-15 pro closed ok
3 Sep 3 '12 eng>jpn Long-Life Pavement Rehabilitation Strategies 長期耐用舗装復興計画 pro closed ok