Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
4 Oct 9 '20 eng>chi AI-powered AI助力 pro closed no
4 Oct 8 '20 eng>chi bundle 服务包 pro closed no
4 Oct 8 '20 eng>chi Fuel 助力 pro closed no
- Sep 30 '20 eng>chi accessibility 可达性 pro closed no
- Sep 9 '20 eng>chi carbon neutrality 碳中和,碳平衡 pro open no
- Jul 13 '20 eng>chi field of view (FOV) 视野 pro open no
4 Jun 19 '20 eng>chi run out of calibration 超出校准范围 pro closed no
4 Jun 18 '20 eng>chi Air Infusion 空气进入 pro closed no
4 Jun 16 '20 eng>chi read 阅读 pro closed no
- Jun 16 '20 eng>chi Tap the ‘Tick’ icon 单击“对勾”图标确认报警时间。 pro closed no
4 Mar 17 '20 chi>eng "串油" oil carryover pro closed no
3 Dec 9 '19 chi>eng 上装 Upper structure,Upper body pro closed no
- Nov 15 '19 eng>chi DO, DO NOT 应当、切勿 pro closed ok
- Nov 4 '19 eng>chi workscope 工作范围 pro closed no
- Nov 3 '19 eng>chi suspension 暂停(屠宰) pro closed ok
- Oct 29 '19 eng>chi No good deed goes unpunished 吃力不讨好 pro closed ok
- Oct 28 '19 chi>eng 光学观测 optical observation, optical monitoring pro closed no
4 Oct 25 '19 chi>eng 坏账准备 Bad debt reserves pro closed no
- Oct 25 '19 chi>eng 计提折旧 accrual of depreciation pro closed no
- Oct 25 '19 chi>eng 核销法 cancel after verification pro closed no
- Sep 29 '19 chi>eng 工程试车 trial run pro closed no
- Sep 29 '19 chi>eng 无负荷联动试车条件 no-load linkage trial-run conditions pro closed no
- Sep 29 '19 chi>eng 单机无负荷 individual no-load trial running pro closed no
- Sep 21 '19 eng>chi technical claim 技术诉求 pro open no
- Sep 20 '19 eng>chi Pre-Finishing Block 预处理装置 pro closed no
- Jun 25 '19 eng>chi formal waiver 正式豁免条款 pro closed no
- Jun 25 '19 eng>chi Directive 2014/51/EU Omnibus II Article 270 2014/51/EU第II代综合指令第270款 pro closed no
- May 20 '19 eng>chi Spider 十字轴 pro closed no
- May 14 '19 chi>eng 南通翔龙海洋工程技术有限公司 NANTONG SLOET OCEAN ENGINEERING CO., LTD. pro closed ok
4 May 5 '19 eng>chi up to 低压可至 pro closed no
- Apr 30 '19 chi>eng 带料试车 commissioning pro closed no
- Apr 30 '19 chi>eng 火法铜冶炼厂 pyrometallurgical copper refinery pro closed ok
2 Apr 30 '19 chi>eng 加热浸出厂 hot leaching factory pro closed ok
4 Apr 29 '19 chi>eng 换电系统 Battery Swap System pro closed no
4 Apr 29 '19 chi>eng 并线辅助 Blind Spot Monitoring ,BSM或Blind Spot Detection, BSD pro closed no
- Mar 21 '19 eng>chi Intrusion switch/Cable 防入侵开关/连接线 pro just_closed no
- Apr 27 '18 eng>chi departure 离职 pro closed no
- Apr 27 '18 eng>chi tab stacks 选项卡堆叠 pro closed no
- Apr 27 '18 eng>chi Additives can be used in PM materials that remain inert because of solid state s 可在粉末冶金 (PM) 材料中使用因其固态属性而仍可保持惰性的添加剂 pro closed no
- Apr 26 '18 eng>chi limited, straight-line traction 有限动力的直线牵引方式 pro open no
- Feb 26 '15 eng>chi construction practice 建筑规范 pro just_closed no
- Jul 25 '13 eng>chi to a mirror-like finish (抛光)到镜面般表面效果 pro closed no
4 Jul 5 '13 eng>chi in the sense of 根据 pro closed no
4 Jul 5 '13 eng>chi average 单独海损 pro closed no
4 Jul 2 '13 eng>chi tax free 免税 easy closed ok
4 Jun 26 '13 eng>chi upon adequate completion of my services 完全完成我的服务之后 easy closed ok
- Jun 12 '13 eng>chi lead pack 导套 pro just_closed no
4 Jun 12 '13 chi>eng 节点 milestone pro closed ok
4 Jun 12 '13 eng>chi an open floor plan 敞开式设计 pro closed no
- Jun 13 '13 eng>chi situated and set up 定位并设置 pro closed no
Asked | Open questions | Answered