Sekcje i marsze |
|
Discussion entries: 2 | |
---|---|
tripping Explanation: Otwór dzieli się na sekcje – każda z nich wiercona jest inną średnicą świdra. Wiercenie danej sekcji to zapuszczenie do otworu świdra, wiercenie i wyciągnięcie świdra na powierzchnię. Taki cykl nazywa się marszem. Tripping pipe (or "Making a round trip" or simply "Making a trip") is the physical act of pulling the drill string out of the wellbore and then running it back in. (niestety nie ma tu mowy o wierceniu) Reference: http://www.zionoil.com/updates/excruciating-difficulty-of-dr... Reference: http://www.kierunekchemia.pl/artykul,21125,page,2.html |
| |||||||||
Grading comment
| ||||||||||
|
25 mins |
Reference: Sekcje i marsze Reference information: Otwór dzieli się na sekcje – każda z nich wiercona jest inną średnicą świdra. Wiercenie danej sekcji to zapuszczenie do otworu świdra, wiercenie i wyciągnięcie świdra na powierzchnię. Taki cykl nazywa się marszem. Marszowanie powtarza się aż do osiągnięcia żądanej głębokości sekcji. Następny etap to zapuszczenie do otworu rur okładzinowych o odpowiednio dobranej długości, średnicy i wytrzymałości. Sekcję rur cementuje się dla ich uszczelnienia zaczynem cementowym ze specjalnymi dodatkami. Po związaniu cementu wierci się następną sekcję mniejszą średnicą świdra, aż do osiągnięcia głębokości końcowej. Na Bałtyku wiercimy sekcje otworu o średnicach 26”, 17 ½” 12 ¼”, 8 ½”, a niekiedy też 6”. - http://www.kierunekchemia.pl/artykul,21125,page,2.html -------------------------------------------------- Note added at 28 mins (2017-05-08 17:20:37 GMT) -------------------------------------------------- Basics of the Drilling Process Natural gas wells are constructed with multiple layers of pipe known as casing (an entire length of casing is known as a casing string). Traditional wells are not drilled from top to bottom at the same diameter but rather in a series of progressively smaller-diameter intervals. The top interval is drilled starting at the surface and has the largest diameter hole. After a suitable depth has been reached, the hole is lined with casing that is slightly smaller than the diameter of the hole. Then cement is pumped into the space between the wall of the drilled hole and the outside of the casing. Next, a smaller-diameter hole is drilled to a lower depth inside the previous string of casing. Another casing string is installed to that depth and cemented. This process may be repeated several more times. The final number of casing strings depends on the regulatory requirements in place at that location. It reflects the total depth of the well and the strength and sensitivity of the formations through which the well passes. - http://lingo.cast.uark.edu/lingopublic/natgas/drill/index.ht... -------------------------------------------------- Note added at 30 mins (2017-05-08 17:22:32 GMT) -------------------------------------------------- Surface section – 26” Hole. Intermediate section – 17 1/2” Hole Intermediate section –14 3/4” Hole Intermediate section –8 ½” - 12 1/4” Hole Production section –5 7/8” - 4 1/8” Hole |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.