03:36 Apr 28, 2019 |
|
Japanese to English translations [Non-PRO] Tech/Engineering - Construction / Civil Engineering / 鉄骨工事 | |||||||
---|---|---|---|---|---|---|---|
|
|
Summary of answers provided | ||||
---|---|---|---|---|
2 | in situ assembled frame structures / cantilever construction? |
|
in situ assembled frame structures / cantilever construction? Explanation: http://www.ekt.bme.hu/ArchEng/Construction of steel structur... page 9 https://www.intechopen.com/books/applications-of-design-for-... Title of partial process in steel frame building: partial process alternatives (short description) BBR | Construction Methods - BBR Network www.bbrnetwork.com/technologies/construction-methods.html Balanced cantilever (cast-in-situ and precast) ... Free cantilevering is a method of construction where a structure is built outward from a fixed point to form a cantilever structure, without temporary support, using staged cast-in-situ construction. -------------------------------------------------- Note added at 1 day 2 hrs (2019-04-29 05:58:27 GMT) -------------------------------------------------- https://www.steelconstruction.info/Construction See the section Erection techniques and mobile cranes -------------------------------------------------- Note added at 1 day 2 hrs (2019-04-29 06:05:04 GMT) -------------------------------------------------- I found the "Escape method" it is a specific Japanese invention and patent by Minoru Iino Masatoshi Kageyama Fusako Sugata Masayuki Tokawa Tadashi Yoshida Application filed by Tekken Constr Co Ltd, 鉄建建設株式会社 Construction method and device for structure As described above, by erecting steel columns C of the first node joining the existing foundation pile, repeated predetermined times a step of in the same manner as in the (1) to (3) if necessary, the vertical structure add built a first node of the pillars is the direction member. Thereafter, build a structure in lamination process as will bridged between attached built 1 milestone beam is transverse member posts. Alternatively, with built two pillars, it may be began to build in such built escape method and folding screen denominated method to repeat that it will pass over the intervening beams, set up a vertical direction member and the transverse member to go the order is arbitrary. Figure 6 shows an example in which built beams 1 milestone thereon built, the first node of the column on the foundation pile over between the home by the operator as described above. -------------------------------------------------- Note added at 1 day 2 hrs (2019-04-29 06:05:39 GMT) -------------------------------------------------- JP2007321399A - Construction method and device for structure ... https://patents.google.com/patent/JP2007321399A/en |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.