GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
21:00 Nov 18, 2016 |
English to Polish translations [PRO] Tech/Engineering - Energy / Power Generation | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: elutek Poland Local time: 10:43 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 +1 | ciepły rozruch |
| ||
3 +1 | rozruchu ze stanu ciepiego |
|
warm start-up ciepły rozruch Explanation: propozycja |
| |
Login to enter a peer comment (or grade) |
warm start-up rozruchu ze stanu ciepiego Explanation: Rys. 2.1. Zmiana parametrów pary w czasie rozruchu ze stanu ciepiego Fig. 2.1. Time variation of steam parameters during warm start-up http://delibra.bg.polsl.pl/Content/7622/Rusin_calosc.pdf cccccccc Warm start-up - This procedure is followed when the turbine was bought to its barring condition, and in that state the turbine is for 8 - 10 hours and the casing temperature is maintained. In this barring gear will be running & gland sealing will be lined up for warming up. This procedure will take ~40 minutes to bring turbine from barring rpm to rated rpm. https://www.quora.com/What-is-the-meaning-definition-of-Cold... |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.