GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
05:48 Apr 12, 2011 |
English to German translations [PRO] Tech/Engineering - Energy / Power Generation | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Johannes Gleim Local time: 14:44 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 | ununterbrochene Unterlage (durchgängige Abstützung) |
|
Discussion entries: 3 | |
---|---|
ununterbrochene Unterlage (durchgängige Abstützung) Explanation: The governing differential equation of the problem is derived from the condition of equilibrium along with the use of viscoelastic material laws for the beam and the continuous support http://www.baufachinformation.de/zeitschriftenartikel.jsp?z=... Placing on discontinuous support: PLACING ON CONCRETE BASE: Placing of rails on concrete could generally occur in two different ways: - on continuous support - on discontinuous support : The procedure to be followed is the same described for placing on continuous support. The difference is the use of single base plates instead of a continuous base plate. http://www.valente.it/en/pads_place-down-systems.htm |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.