04:37 May 9, 2020 |
German to English translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Becca Resnik United States Local time: 09:46 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 +2 | (additional) lifting operations |
| ||
4 | extended /prolonged lifting operations |
| ||
4 -1 | excess load lift |
|
Discussion entries: 7 | |
---|---|
excess load lift Explanation: Looks like from my first reference that this is looking at gravitational potential energy, which differs from potential energy in that it relates to an object at height (as opposed to other types of PE, such as a spring). In context with heavy machinery, this could be translated as "excess load lift." https://www.softschools.com/formulas/physics/gravitational_potential_energy_formula/72/ https://www.solarschools.net/knowledge-bank/energy/forms/potential |
| ||
Grading comment
| |||
Notes to answerer
| |||
Login to enter a peer comment (or grade) |
(additional) lifting operations Explanation: I do not know where the word "excess" should come from. IMO, lifting work that was not planned is meant here. Other lifting operations Are there additional lifting operations, or plant movements taking place simultaneously? Implement a crane coordination plan detailing the spacial, time or operating conditions to allow the operation to go ahead. http://omniaengineering.yolasite.com/planning-your-lift.php |
| |