17:09 Jan 4, 2019 |
German to English translations [PRO] Law/Patents - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Herbmione Granger Germany Local time: 05:10 | ||||||
Grading comment
|
Summary of reference entries provided | |||
---|---|---|---|
Baugrundrisiko. english: risk relating to the ground and subsoil conditions of a building site |
|
Discussion entries: 5 | |
---|---|
insufficient construction site risk analysis Explanation: I would suggest |
| |
Login to enter a peer comment (or grade) |
unassessed / insufficiently assessed geotechnical risk relating to site and soils conditions Explanation: unassessed / insufficiently assessed geotechnical risk relating to construction site ground and soils / subsoil conditions sources: What is geotechnical risk? - Cathie Associates www.cathie-associates.com/.../Managing-geotechnical-risk-1.... Geotechnical risk is the risk to construction work created by the site ground conditions. It is a key element in any construction project which involves the ground ... Geotechnical Risk Register The Geotechnical Risk Register has been ... https://infrastructure.planninginspectorate.gov.uk/.../TR050... The Geotechnical Risk Register has been compiled to show the degree of risk attached to various ground related aspects of the proposed development. 5 Consideration of Alternatives - Northamptonshire County Council www3.northamptonshire.gov.uk/.../14.00086.CCDFUL-ESV1-Ch... ... unassessed in the appraisal report. .... geotechnical risk assessment, concluded that the Northern. Route scheme has the least geotechnical risk associated. Geophysical Desk Study - Science Museum Group https://group.sciencemuseum.org.uk/.../20-Geophysical-Desk-S... Preliminary Conceptual Site Model and Risk Assessment ..... The low level of risk links to the expected site ground conditions of medium to ...... Drilling of one rotary core borehole in the soakaway field to prove groundwater level is sufficiently low. Who takes the risk in the site and soils conditions? | Wright Hassall https://www.wrighthassall.co.uk/.../who-takes-risk-site-and-... 16 sep. 2015 - It is always open to the parties to decide where risk lies between ... Halsbury's Laws of England states: “It is no ... Hudson's Building and Engineering Contracts, a leading “bible” on Construction Law, states ... The inaccuracies in the site and soil conditions described in a survey can be quite fundamental. in German: Immobilien-Fachwissen von A bis Z | Online-Lexikon https://lexikon.immobilien-fachwissen.de/index.php?UID... - Baugrundrisiko. english: risk relating to the ground and subsoil conditions of a building site ... Man unterscheidet ein echtes und ein unechtes Baugrundrisiko. -------------------------------------------------- Note added at 8 hrs (2019-01-05 02:05:21 GMT) -------------------------------------------------- "nicht oder nicht hinreichend untersucht oder berücksichtigt" http://www.baurecht.berlin-mitte-anwalt.de/baurecht.php?id_l... could also be construed as: "unassessed or insufficiently assessed or considered" |
| ||
Notes to answerer
| |||
Login to enter a peer comment (or grade) |
controllable risk (factors) Explanation: Seems to be the concept. Manmade vs natural? -------------------------------------------------- Note added at 3 days 31 mins (2019-01-07 17:40:49 GMT) -------------------------------------------------- "Foreseeable" is also good, since "unforeseeable _ risk" is used for echtes Baurisiko. So AN will bear the cost for any controllable or foreseeable problems associated with the area being built on. https://www.wiley.com/en-us/International Construction Contr... http://www.mondaq.com/x/206164/real estate/Unforeseen Ground... https://www.lexology.com/library/detail.aspx?g=4bf66d81-cea7... -------------------------------------------------- Note added at 3 days 39 mins (2019-01-07 17:49:01 GMT) -------------------------------------------------- Edit: Baugrundrisiko -------------------------------------------------- Note added at 3 days 15 hrs (2019-01-08 08:46:49 GMT) -------------------------------------------------- I'm not sure if "risk" works well for Risiko. In English, risk isn't passed along like a hot potato AFAIK. Maybe something like this works: In the event of damages arising from the nature of the land during the construction project, AG will bear the cost if it was unforeseeable (Baugrundrisiko) and AN will bear the cost if it was foreseeable, i.e. preventable. https://www.advocado.de/ratgeber/grundstuecks-und-immobilien... https://www.bauingenieur24.de/fachbeitraege/baurecht/baugrun... Reference: http://www.baurecht.berlin-mitte-anwalt.de/baurecht/baurecht... https://hbr.org/1989/03/you-can-manage-construction-risks |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
potential construction risk Explanation: I'd call it. The German word does not do justice to what is meant, IMO |
| |
Login to enter a peer comment (or grade) |
40 mins |
Reference: Baugrundrisiko. english: risk relating to the ground and subsoil conditions of a building site Reference information: Immobilien-Fachwissen von A bis Z | Online-Lexikon https://lexikon.immobilien-fachwissen.de/index.php?UID... - Baugrundrisiko. english: risk relating to the ground and subsoil conditions of a building site ... Man unterscheidet ein echtes und ein unechtes Baugrundrisiko. |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.