10:28 Nov 19, 2015 |
French to English translations [PRO] Tech/Engineering - Construction / Civil Engineering / construction management and engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: narasimha (X) India Local time: 13:14 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 +1 | Locking in position of reinforcement after checking. |
| ||
2 | clamping of reinforcements after testing |
|
clamping of reinforcements after testing Explanation: I can't be sure about "clamping" but I am pretty sure that your "armatures" are the steel reinforcement bars found in reinforced concrete. |
| |
Login to enter a peer comment (or grade) |
Locking in position of reinforcement after checking. Explanation: The reinforcements are inspected after binding them as per the requirement in the drawing and kept in position securely for concreting. |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.