19:06 Apr 9, 2015 |
Norwegian to English translations [PRO] Tech/Engineering - Construction / Civil Engineering / casting concrete | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Sean Martin (X) Norway Local time: 11:08 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | fissure indication |
| ||
4 | control joint |
| ||
2 | screed rail |
| ||
1 | display |
|
display Explanation: . |
| |
Login to enter a peer comment (or grade) |
fissure indication Explanation: Rissanvisende fuge crack-inducing joint asfalting roads rissanvisere fissure-indicators roads Reference: http://nff.no/wp-content/uploads/2014/01/Publication_19.pdf |
| |
Login to enter a peer comment (or grade) |
control joint Explanation: Alternatively crack inducer. In terms of concrete, a control joint is basically a method of controlling the formation of cracks by, for example cutting a groove into finished concrete at certain distances. |
| |
Login to enter a peer comment (or grade) |
screed rail Explanation: Perhaps your term refers to "rissanviser". My confidence level is low because it is a slightly different term. Reference: http://www.hansmark.no/storefront.php?pid=500 Reference: http://www.siteright.net/form-screed-rails-p-67.html |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.