early production containment

Polish translation: plan kontroli jakości we wczesnym etapie produkcji

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:early production containment
Polish translation:plan kontroli jakości we wczesnym etapie produkcji
Entered by: Frank Szmulowicz, Ph. D.

01:44 Dec 19, 2014
English to Polish translations [PRO]
Tech/Engineering - Telecom(munications)
English term or phrase: early production containment
Early Production Containment Period - Production runs during the
start-up and acceleration of a new or changed product or manufacturing
process
Portable
Local time: 21:10
plan kontroli jakości we wczesnym etapie produkcji
Explanation:
Propozycja

ccccccccccccccccccccccccccccccc
Early Production Containment - short version
Is a pre-launch control plan. GM has designated this as GP-12 in their documentation.

ccccccccccccccc
Early Production Containment (GP-12)
The purpose of GP-12 is to document the supplier’s efforts to gain control of its processes during start-up and acceleration, so that any quality issues that may arise are quickly identified and correct at the supplier's location and not at the Remy Inc. customer’s manufacturing location.
http://www.remyinc.com/docs/suppliers/Supplier_Manual_App/Ea...
ccccccccccccccccccccccccccccc

NOTE: “Early Production Containment” (Safe-Launch Plan) has been incorporated into the ABC Group Specific Section of the “Production Part Approval
cccccccccccccccccccccccccccccccccccccccccccccccccccc

Level II containment requires the supplier to implement extraordinary inspection of product to contain a specific failure. Containment actions must verify that requirements are met and be approved by the proseat production facility. Records must be made available to proseat upon request.
http://www.proseat.de/uploads/media/C_PUR_D_003_UK__issue4.p...
ccccccccccccccc

Containment Plan
Suppliers must have an early production containment process (e.g. GP-12, Pre-launch control plan). This is defined as the supplier having extra controls in place for a minimum of the first 30 days production to ensure all requirements are met during the start of production
http://www.panasonic.com/business/automotive/includes/pdf/su...
Selected response from:

Frank Szmulowicz, Ph. D.
United States
Local time: 15:10
Grading comment
4 KudoZ points were awarded for this answer



Summary of answers provided
2 +1plan kontroli jakości we wczesnym etapie produkcji
Frank Szmulowicz, Ph. D.


  

Answers


33 mins   confidence: Answerer confidence 2/5Answerer confidence 2/5 peer agreement (net): +1
plan kontroli jakości we wczesnym etapie produkcji


Explanation:
Propozycja

ccccccccccccccccccccccccccccccc
Early Production Containment - short version
Is a pre-launch control plan. GM has designated this as GP-12 in their documentation.

ccccccccccccccc
Early Production Containment (GP-12)
The purpose of GP-12 is to document the supplier’s efforts to gain control of its processes during start-up and acceleration, so that any quality issues that may arise are quickly identified and correct at the supplier's location and not at the Remy Inc. customer’s manufacturing location.
http://www.remyinc.com/docs/suppliers/Supplier_Manual_App/Ea...
ccccccccccccccccccccccccccccc

NOTE: “Early Production Containment” (Safe-Launch Plan) has been incorporated into the ABC Group Specific Section of the “Production Part Approval
cccccccccccccccccccccccccccccccccccccccccccccccccccc

Level II containment requires the supplier to implement extraordinary inspection of product to contain a specific failure. Containment actions must verify that requirements are met and be approved by the proseat production facility. Records must be made available to proseat upon request.
http://www.proseat.de/uploads/media/C_PUR_D_003_UK__issue4.p...
ccccccccccccccc

Containment Plan
Suppliers must have an early production containment process (e.g. GP-12, Pre-launch control plan). This is defined as the supplier having extra controls in place for a minimum of the first 30 days production to ensure all requirements are met during the start of production
http://www.panasonic.com/business/automotive/includes/pdf/su...

Frank Szmulowicz, Ph. D.
United States
Local time: 15:10
Native speaker of: Native in EnglishEnglish, Native in PolishPolish
PRO pts in category: 98

Peer comments on this answer (and responses from the answerer)
agree  mike23: Yes. Good ideas. Good morning
5 hrs
  -> Thank you, Michał. This should give the sense, especially using commonly used expressions.
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search